Notes:

Unlike the Merlin 3, the HM.1 was delivered under a contract with Lockheed Martin; manufacturer AgustaWestland was only a sub-contractor. The requirement was for a fully-integrated weapons system incorporating complex mission equipment which in itself underwent a number of technology refreshments during the life of the contract. The delivery timescale was lengthened by a significant change of role brought about by the end of the Cold War and a switch from deep-water to littoral operating environments.

Photographer

Contact photographer for terms of use.

Registration

ZH856

Photo Date

Jul 13, 2014

Uploaded

Oct 24, 2014

Views

2,177

Likes

0

Badges

None

Notes

Unlike the Merlin 3, the HM.1 was delivered under a contract with Lockheed Martin; manufacturer AgustaWestland was only a sub-contractor. The requirement was for a fully-integrated weapons system incorporating complex mission equipment which in itself underwent a number of technology refreshments during the life of the contract. The delivery timescale was lengthened by a significant change of role brought about by the end of the Cold War and a switch from deep-water to littoral operating environments.

Camera

Canon 5d MkIII | Canon 100-400 Show Exif data
Contact photographer for terms of use.

Comments

No comments