Remarks: The subcab, which will house apron control, is lifted to fit over the concrete column of the new control tower. Later, the visual control room will be added on top.
Remarks: Taxiing out past the new control tower structure. The shaft is complete and the tower cab will be built alongside, with it due to be lifted into place June 2012.