|
|
Slide show powered by PicLens.
|
| -- Click on any thumbnail (small) image below to view the photo's full-size version. -- |
|
|
|
|
|
| Remarks: The new T3 is launched on May 3., 2012
Today's photo |
|
|
|
|
|
|
| Remarks: New Terminal of Xian Xianyang Airport, departure level |
|
|
|
|
|
|
| Remarks: Scanned from negative. |
|
|
|
|
|
|
| Remarks: Terminal 3 departure area |
|
|
|
|
|
|
| Remarks: The constructions of XIY's new terminal and new runway is done. The connecting taxiways are still on going. Lots of testings are on the way. |
|
|
|
| | |
| | |  |
|
|
|
| Remarks: Xi'an International check-in area. |
|
|
|
|
|
|
| Remarks: Before flight back to BJS, inside XIANYANG intl airport's terminal, check-in area. |
|
|
|
|
|
|
| Remarks: Inside the departures waiting hall. |
|
|
|
| | |
« 1 2 »
|